Retrofit design of Ballast Water Treatment System installation on board of a Ro/Ro vessel
Task
Year
Location
Capacity
Deliverables
Task
3D Scanning of the place of installation. Integration of treatment system into existing ballast water system. GRE pipes DN250. Development and submission of class drawings.
Year
2021
Location
Helsingborg, Sweden
Capacity
2 x BWTS units Alfa Laval 500
Deliverables
- Approved integration plan
- Class drawings
Our Services:
Menu
Design Projects:
Menu
Contact person:
Dmitry Avotin
Design Engineer
+46 (0) 733 627252
dmitry.avotin@inspekt.se